Main page / Completed Projects / Studies and design of the first and second stages of substructure and superstructure of Tehran Metro line 6 and workshop
Studies and design of the first and second stages of substructure and superstructure of Tehran Metro line 6 and workshop - Picture 1

Studies and design of the first and second stages of substructure and superstructure of Tehran Metro line 6 and workshop

September, 2007
Substructure Superstructure


Studies and design of the first and second stages of  substructure and superstructure of Tehran Metro line 6 and workshop

Tehran urban and suburban railway operation Co.

Main Client

Design

Type of Service

Behro

Project Management

-

Contractor/Contracttype

2.589

Contract Amount (Millions Of Rials)

2007-09

Starting Date

2009-04

Percent Of Progress

کمی منتظر بمانید...