Thursday, November 21, 2024
Login
Email
Toggle navigation
Projects
Current
All Current Projects
TEHRAN Metro (Line 1)
TEHRAN Metro (Line 3)
TEHRAN Metro (Line 6)
KARAJ Metro (Line 2)
ISFAHAN Metro (Line 2)
SHIRAZ Metro (Line 2)
Road
Other
LINE 10 METRO OF TEHRAN
Completed
All Completed Projects
TEHRAN Metro (Line 1)
TEHRAN Metro (Line 3)
TEHRAN Metro (Line 4)
TEHRAN Metro (Line 6)
TEHRAN Metro (Line 7)
KARAJ Metro (Line 2)
ISFAHAN Metro (Line 2)
TABRIZ Metro (Line 2)
SHIRAZ Metro (Line 2)
MASHHAD Metro (Line 2)
TEHRAN-KARAJ Railway line
MARAGHEH-URMIA Railway line
ZAHEDAN Railway Station
HASHTGERD Metro Station
MEHRSHAHR Dopt
Road
Other
Events & Announcements
Articles & publications
About us
Introduction
Board of Directors
Chart
Key Personel
Certificates
Contact us
Main page
/
Current Projects
/
MC of AZADEGAN Depot Construction Project (Tehran Line 3)
MC of AZADEGAN Depot Construction Project (Tehran Line 3)
1399/08/12
Civil
Tags:
Projects time line
1399/08/12
MC of AZADEGAN Depot Construction Project (Tehran Line 3)
August 22, 2018
Studies and design of the first stage of Dowlatabad workshop of Line 6 of Tehran Metro
June 20, 2017
Design Studies of the second stage of the substructure and superstructure of the railways, landscaping and workshop buildings of Tabriz urban railway
July 28, 2012
Studies of the first, second and third stages of terminal and First stage studies of Karaj urban railway line 2
September, 2004
Studies, design and monitoring (QC) of railway between Golshahr station and Mehrshahr workshop and Imamzadeh mohammad road overpass
July, 2003
Phase two design of split level Intersection at Karaj – Qazvin highway – Mahdasht road
April, 2001
Studies, design and monitoring (QC) of Mehrshahr workshop buildings
×
خطا!
کمی منتظر بمانید...