Wednesday, October 30, 2024
Login
Email
Toggle navigation
Projects
Current
All Current Projects
TEHRAN Metro (Line 1)
TEHRAN Metro (Line 3)
TEHRAN Metro (Line 6)
KARAJ Metro (Line 2)
ISFAHAN Metro (Line 2)
SHIRAZ Metro (Line 2)
Road
Other
LINE 10 METRO OF TEHRAN
Completed
All Completed Projects
TEHRAN Metro (Line 1)
TEHRAN Metro (Line 3)
TEHRAN Metro (Line 4)
TEHRAN Metro (Line 6)
TEHRAN Metro (Line 7)
KARAJ Metro (Line 2)
ISFAHAN Metro (Line 2)
TABRIZ Metro (Line 2)
SHIRAZ Metro (Line 2)
MASHHAD Metro (Line 2)
TEHRAN-KARAJ Railway line
MARAGHEH-URMIA Railway line
ZAHEDAN Railway Station
HASHTGERD Metro Station
MEHRSHAHR Dopt
Road
Other
Events & Announcements
Articles & publications
About us
Introduction
Board of Directors
Chart
Key Personel
Certificates
Contact us
Main page
/
Current Projects
/
Consultant to Project Manager on Design and Construction of Shiraz Urban railway line 2
Consultant to Project Manager on Design and Construction of Shiraz Urban railway line 2
April 21, 2014
Subway Station
Tags:
Consultant
manager
Design
Construction
shiraz
urban
train
line2
railway
station
Projects time line
July 2017
L2 STATION, LINE 2 METRO OF ISFAHAN, ISFAHAN, IRAN (L2S-L2MI)
October 9, 2018
Design of access routes and landscaping of Hashtgerd Station
December 5, 2016
Supervision(QC) of construction of the terminal station of the electric train in Hashtgerd
August 22, 2018
Studies and design of the first stage of northerly parkings of Tehran Metro Line 6
August 22, 2018
Studies and design of the first stage of the mechanized tunnel and the southerly extension of Tehran Metro line 6
August 22, 2017
Studies and design of the first and second stages of Imam Hossein Square and Hafez stations of line 2 of Isfahan urban and suburban railway
March 5, 2017
Design of first and second phase of extension of the southerly part of Tehran Metro Line 6
August 8, 2016
Design of first stage of extension of the southerly part of Tehran Metro Line 6
April 21, 2014
Consultant to Project Manager on Design and Construction of Shiraz Urban railway line 2
April 12, 2014
Consultancy and monitoring (QC) of mechanized tunnel and southerly stations of Tehran Metro Line
June 21, 2012
studies of metro system and system of operation for the new cities of Majlesi, Baharestan and Fouladshahr railways
June, 2012
First and second stage design of Hashtgerd Station
June, 2011
Third stage engineering services for 10 underground stations and the related structures of Tehran Metro line 6
May, 2010
Consultant to Project Manager of Southerly extension of Tehran metro line 1 from Shahed Station to Imam airport and New city of Parand
October, 2009
Project management of north-westerly extension of Tehran Metro Line 1
September, 2009
Studies of Second stage of substructure and superstructure of Tehran Metro Line 7
August, 2009
The first and second stage studies of the northerly extension of Tehran Metro Line 3
January, 2008
Studies and design of the first and second stages and monitoring (QC) of the extension of Tehran metro line one from Shrine station to Kahrizak station
September, 2004
Studies and monitoring (QC) of extension of Tehran metro line one to Imam Khomeini Airport
January, 2004
Design studies and monitoring (QC) of the expansion of Mehrshahr workshop and covered parking
December, 2003
Coordination of Mehrshahr workshop projects
January, 1999
Nondestructive testing of rail welding of Tehran-Karaj high-speed railway
March, 1998
Studies and Monitoring (QC) of tunnels, stations and ventilators of Tehran metro line 4
March, 1998
Studies and Monitoring (QC) of completion of substructure and superstructure of Tehran-Karaj railway
×
خطا!
کمی منتظر بمانید...